Measuring Site Performance, Coursework Example

Pages: 4

Words: 1066

Coursework

Part 1: Description of Procedures

Preparation of Pipes: This process intends to prepare the pipes that are to be used for the project. The measurement of the pipes have been considered through research before the imposition of the project.

Laying of the Pipes: This phase introduces the beginning of the project proper where the pipes are laid down in place. Before this is done, it is important the measurement of all the pipes are specifically accurate to avoid any particular space-related problems when the drainage system is already set to operate.

Laying Down Soil as Stuffing to the Area: This process entails to protect the entire setup of the drainage pipes through layering soil around the location hence making it easier for the pipes to stay in place.

Strengthening the Drainage Walls: This process hopes to manage the manner by which the walls of the drainage system are built and assured for proper placing hence strengthening the whole system created.

Establishing Steel Barricades:

The steel barricades are supposed to protect the whole system from any danger especially those that are related to natural disasters such as that of soil erosions or the possible occurrence of earthquakes.

Quality Assurance and Final Checking: This assures that the project has been completed according to the level of quality it has been expected to perform with.

Finalizing the Markings of the Drainage: This part of the project finalizes the entire operation, which specifically invokes the possibility of the entire system’s operation.

Researh and Planning Process

Part 2: I/O Model

Part 3: Data Collection (Work Sampling Table)

 

Continuous Time Study

Project: pipe worker

Day : Wednesday

Crew activity: pipeline work

Humidity: 50% Recorder:

Date: March 28th, 2012

Weather: Sunny

C C

Study Object:

 

Duration of Working Tasks (seconds)

 

 

Cycle

 

1

 

2

 

3

Total Time at task (mins) Average task time (mins) Percentage at Task
Start time mins 12:10 7:24 11:48
Preparation of Pipes 55 48 51 154 51.3 25.74%
Laying of Pipes 0 11 0 11 3.7 1.86%
Establishing Walls 50 58 42 150 50 25.09%
Compacting and Filling 19 16 15 50 16.7 8.38%
Cement Application 11 11 8 30 10 5.02%
Compacting and Filling 6 4 7 17 5.7 2.86%
Final Quality Assurance 7 7 10 24 8 4.01%
Final Application of Cement and Marking 10 12 8 30 10 5.02%

 In relation to the project that has been completed, it could be noted that the workers were directed to handling the task according to schedule and they were relatively able to follow through given that there were no delays and everything went according to what has been planned earlier. The weather was fine and all the materials were prepared beforehand; not to mention the precise consideration of measurements that are supposed to be applied in the project; all these worked well towards the overall completion of the project.

Part 4: What Has Been Discovered

The precision and accuracy of measurements of the pipes made it easier for the workers to complete their tasks. The scheduled activities were sufficient enough to support the needs of establishing better drainage systems. Considerably, it is because of this particular approach that waiting times were avoided and every task were accomplished according to schedule.

Continuous time study table:

 

Work Time

 

Task Content

Value-adding 1 Pipe Laying, Laying Layers, Compacting
Contributory 2 Laying soil protection for the entire setup
Possible Hindrances 3 Work Breaks and specific assumption of conditions of project developments with the constant checking from supervisors

Implication of data on table:

Implication of data on table

This table hopes to indicate how the different procedures encountered by the team members in relation to the establishment of the project has actually been handled by the workers through empowered control of time and the proper assumption on how to recognize the importance of the schedule created for them to follow. Relatively, the table herein tries to indicate that the efficiency of work imposed by the members of the team were measured through three different elements namely time efficiency, proper response to assignment and risk management through preparation and the setting of alternative solutions to possible problems that may arise. So far, the capacity of the project managers to insist on the preparation and risk management considerations allowed the whole team to meet the deadline while specifically assuring the condition by which the excellence of the project’s completion has been responded to properly.

It could be learned from this documentation that the process of creating a project involves the need to plan ahead of time. The planning process specifically includes the consideration by which the objective of the project becomes the central course for the assumption of the documentation. Budgeting and scheduling of tasks is also a part of this process. This way, the individuals who are to be assigned to complete specific tasks are supposed to be given a chance to see their assignments beforehand and thus prepare for them. The plan’s blueprint specifically allows the project managers to find a way to consider situations that are likely to bring in particular problems later on and thus create responsive procedures to resolve the said situations.

Basing from this project observation, it could be noted that the proper assumption of the planning process made it certain that the project’s success could be aligned with the desires of the whole team included in the project. The manner by which the whole team of workers followed the assignments according to schedule made it possible for the whole project to be completed according to time, budget and the quality expected from the completion of the overall work.

Preempting the possibility of success in a particular project specifically involves a great deal of control that could actually make a specific impact on how modern ways of handling projects especially depending on handling schedules effectively impacts the results that the project shall actually be noted for in the future. The establishment of an effective drainage system specifically has great value for the community. Its completion on time has a great value for the sake of the people it is supposed to serve accordingly. In this case, it could be observed and agreed upon that the project was indeed successful.

Time is precious

Time is precious

don’t waste it!

Get instant essay
writing help!
Get instant essay writing help!
Plagiarism-free guarantee

Plagiarism-free
guarantee

Privacy guarantee

Privacy
guarantee

Secure checkout

Secure
checkout

Money back guarantee

Money back
guarantee

Related Coursework Samples & Examples

Residential Sanitation Automation, Coursework Example

Contracting for Trash Table 1 presents information and analysis suggesting that the automated system with new technology will save the city money over time. Over [...]

Pages: 1

Words: 404

Coursework

Relevant Law and Process, Coursework Example

Part I Personal contact information: Elsa and Doug Gardner Alternative contact information: Representative contact information: Respondent contact information: Cornerstone Family Services. Grounds of Alleged Discrimination [...]

Pages: 2

Words: 637

Coursework

Venture Capital, Coursework Example

Alpha Ventures’ proposal has two different capitalization tables. The tables depend on whether the fiscal year 2000 revenues threshold of $500,000 will be met. Question [...]

Pages: 5

Words: 1292

Coursework

Veil Piercing in the Supreme Court, Coursework Example

Introduction Prest v. Petrodel [2013] UKSC 34 has been one of the most contentious cases in English company law for almost ten years. This case [...]

Pages: 12

Words: 3238

Coursework

Consumer Law, Coursework Example

Introduction The existing economic theory and taxonomic framework, which identifies consumers as ‘average,’ ‘vulnerable,’ ‘informed,’ or ‘confident,’ is a valuable tool for regulating consumer behavior [...]

Pages: 14

Words: 3725

Coursework

Banking Law – Critically Discuss Statement, Coursework Example

Maintaining client confidentiality is a core value in several professions, like law and banking. The notion behind secrecy is that sensitive information must be safeguarded [...]

Pages: 13

Words: 3530

Coursework

Residential Sanitation Automation, Coursework Example

Contracting for Trash Table 1 presents information and analysis suggesting that the automated system with new technology will save the city money over time. Over [...]

Pages: 1

Words: 404

Coursework

Relevant Law and Process, Coursework Example

Part I Personal contact information: Elsa and Doug Gardner Alternative contact information: Representative contact information: Respondent contact information: Cornerstone Family Services. Grounds of Alleged Discrimination [...]

Pages: 2

Words: 637

Coursework

Venture Capital, Coursework Example

Alpha Ventures’ proposal has two different capitalization tables. The tables depend on whether the fiscal year 2000 revenues threshold of $500,000 will be met. Question [...]

Pages: 5

Words: 1292

Coursework

Veil Piercing in the Supreme Court, Coursework Example

Introduction Prest v. Petrodel [2013] UKSC 34 has been one of the most contentious cases in English company law for almost ten years. This case [...]

Pages: 12

Words: 3238

Coursework

Consumer Law, Coursework Example

Introduction The existing economic theory and taxonomic framework, which identifies consumers as ‘average,’ ‘vulnerable,’ ‘informed,’ or ‘confident,’ is a valuable tool for regulating consumer behavior [...]

Pages: 14

Words: 3725

Coursework

Banking Law – Critically Discuss Statement, Coursework Example

Maintaining client confidentiality is a core value in several professions, like law and banking. The notion behind secrecy is that sensitive information must be safeguarded [...]

Pages: 13

Words: 3530

Coursework